In July 2020, our neighborhood will be undertaking a series of neighborhood wide projects which will require us to close the parking lots for the repairs to be made.

All vehicles must be moved and re-located from the parking lots by 7 AM on the day the work starts until the work is completed and ready to be reopened to traffic. Failure to move your car may result in towing at owner’s risk and expense.

The current schedule, subject to weather and/or production conditions, is:

Asphalt Repair

  • Millennium Lane: July 14 – 15
  • Decade Court: July 15 – 16
  • Generation Court: July 16 – 17
  • Generation Drive: July 16 – 21

Concrete Repairs (Sidewalk, Curb and Gutter Repairs)

  • Decade Court: July 6 -7
  • Millennium Lane: July 7 – 10
  • Generation Court: July 9-10, July 13
  • Generation Drive: July 13 – 17

Here is important information to know about the repairs:

Asphalt Repair:

  • We have contracted with Brothers Paving & Concrete Corporation
  • We will be milling, repaving, and striping the parking lots
  • Work will be from 7 AM to 5 PM (weather permitting)
  • Do not enter the parking lot until the lots have re-opened
  • Any vehicle blocking access to the work areas may be towed at owner’s risk and expense

Concrete Repair:

  • We have contracted with Brothers Paving & Concrete Corporation
  • We will be replacing sections of sidewalks, curbs and gutters that need repairs
  • Concrete replacement locations have been marked with WHITE paint.
  • Do not park within TWO PARKING SPACES EACH SIDE, OR 50 Feet of the marked areas between the hours of 7 am – 5 pm on the scheduled dates noted above
  • Remove any decorative borders and/or overhanging landscaping (flowers, shrubs, grass, MARK SPRINKLER SYSTEMS, etc.) from the marked locations as the contractor will need to have access to place forms along the border for the new concrete.
  • The contractor will not be responsible for removal of and/or damage to any landscaping or other items that may impede upon the designated work area.
  • Do not walk on concrete for 72 hours after repairs have been made

Brothers Paving is offering homeowners the opportunity to contract for personal concrete sidewalk repairs during this time. If you are interested in purchasing this service, please contact: Joanelize Morales jmorales@capitolcorp.com no later than June 26!

If weather and/or operational issues prevent the above schedules to take place, re-scheduling will be communicated through notice either on cluster mailboxes and/or door-to-door notice.

If you have any questions or have special circumstances that would warrant further assistance, please contact Capitol Management at 703-707-6404, or jmorales@capitolcorp.com.

To keep up to date, Please remember to connect with us online both here on the website and on Facebook and Nextdoor.

For more information, refer to these flyers:

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s